翻訳と辞書 |
Tambaram railway station : ウィキペディア英語版 | Tambaram railway station
Tambaram Railway Station is one of the railway terminal of the Chennai Beach–Tambaram section of the Chennai Suburban Railway Network. It is situated at a distance of 6 km from the centre of Tambaram, a suburb of Chennai located 27 km south of the city centre. It is one of the fastest growing railway hubs outside Chennai Central in the southern direction. Everyday, on an average, around 150,000 commuters use the station. About 280 suburban electric trains operate from Tambaram, including those between Chennai Beach and Chengalpattu and Kancheepuram. Further, more than 25 expresses, including those bound for Howrah and other places in the north pass through the town. It is also third busiest station in the city (after Chennai Central and Chennai Egmore). The daily ticket sales at Tambaram fetch 1 million, half of which comes from suburban travellers. It is the second most revenue-generating station in Chennai after Moore Market Complex. A total of 52 trains pass through the station. Tambaram Railway Station divides Tambaram into East Tambaram and West Tambaram. There are nine platforms in the station. Platforms 3 and 4 are not used as the metre gauge lines are yet to be taken up for conversion, whereas those between 5 and 9 are used by the suburban electric trains between Chennai Beach and Chengalpattu and Tirumalpur and also long distance express trains. Most of the suburban electric train services originating from Tambaram to Beach and Chengalpattu leave from the first two platforms. There is a foot overbridge connecting East and West Tambaram with access to all platforms. In 2008, Southern Railway started building an additional platform at the westernmost side of the railway station, making Platform No.1 a double-discharge platform, a design which helps commuters to alight on either side of the train, similar to the one at Park Railway Station, where the passengers could alight on the western side for quicker access to Chennai Central. ==History== The lines at the station were one of the first in Chennai to be electrified. They were energised on 1.5 kV DC in 1931 with the electrification of the Chennai Beach–Tambaram section, and the third line in the section was electrified on 15 January 1965. The lines further south from the station, up to Chengalpattu, were electrified on 9 January 1965. On 15 January 1967, all the lines were converted to 25 kV AC.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Tambaram railway station」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|